Most bathroom projects don't fail on execution. They fail because nobody wrote down what the project was, in what order it happens, and what it costs — so decisions arrive late, when they're expensive.
Basteq's planner is a free tool that produces that document for you. Answer a handful of questions about your bathroom and you get a roadmap, a budget with contingency built in, and a task list that tells you what to do next.
A few questions about your bathroom, and you'll have a plan, a budget and a next step. No cost.
Open the planner — free| Output | What it does for you |
|---|---|
| A step-by-step roadmap | Your project in the order it actually happens — selections before demolition, rough-in before waterproofing, glass after tile |
| A budget with contingency | An estimate for your scope and ZIP code, with 15% held back for what's behind the wall |
| A scope list | The specific jobs in your project — the raw material for a scope of work contractors can bid against |
| Today's next step | One thing to do now, rather than a wall of tasks |
| A materials estimate | Quantities and costs for tile, mortar, grout and waterproofing, adjusted for your area |
| An assistant | Ask a question, or send a photo, and get an answer in the context of your plan |
It takes a few minutes. Nothing is installed, and there's no cost.
Plenty of tools will give you a cost range. The more useful output is the sequence.
Nearly every avoidable overrun in a bathroom traces back to a decision made later than it should have been. A shower valve chosen after framing. Tile chosen after the drain type was fixed. A niche remembered after waterproofing. Each of those becomes a change order — and a change order is the most expensive way to buy anything, because there's exactly one supplier and no time to think.
A roadmap that puts selections before demolition, and rough-in decisions before the walls close, removes most of that cost before it exists.
Every budget the planner produces holds back 15% as contingency, and flags a project as at-risk rather than on-track when spending starts eating into it. Bathrooms hide their problems behind tile and under floors; the reserve is what turns a rotten subfloor into a phone call instead of a crisis.
Take a common case: a 5' × 8' hall bathroom, tub replaced with a walk-in shower, new vanity and floor tile, better lighting and a new fan, plumbing staying where it is. The plan that comes back is ordered roughly like this:
The estimate arrives alongside it, split into labour, fixtures and materials, plumbing and electrical, permits, and the 15% reserve — so you can see which part of the number to attack if it comes back higher than you hoped.
Nothing in that sequence is exotic. It's just the right order, which is exactly what's hard to hold in your head when you've never done it before.
Worth being straight about the limits:
A roadmap, a budget with contingency, and a clear next step for your bathroom — in a few minutes, free.
Open the planner — freeYes. You answer a few questions about your bathroom and get a roadmap, a budget estimate and a task list at no cost. There's nothing to install — it runs in a browser.
It's an estimate, not a quote. It's based on your scope, your bathroom's size and your ZIP code, with regional cost differences applied and 15% contingency held back. Only a contractor who has seen your bathroom can give you a real price, and nothing can predict what's behind your walls until demolition.
No. You pick jobs from a checklist — walk-in shower, new vanity, floor tile, lighting, exhaust fan and so on — or choose a full gut renovation. If you're unsure, the assistant can talk through what your situation likely needs.
Because labour rates, permit fees and delivery costs vary substantially by market, and a national average is misleading. The same project in Northern Virginia typically runs 15–18% above the national baseline, while Richmond and the Tidewater area sit close to it.
No. It plans the project — scope, sequence, budget and tasks — so you can have a better-informed conversation and compare bids fairly. Plumbing, electrical and structural work still need licensed trades, and in most cases a permit.
Measure the bathroom, and decide whether the plumbing moves. Those two facts shape everything else, and having them ready means the plan you get back is genuinely about your project rather than a generic one.